PSS were contracted to work on a new care home Selsey, West Sussex in install,
- 1562m² of Beam and Block at Ground Floor level,
- 2394m² of 150 and 200mm Hollowcore planks over both the First and Second Floor
- 28t of Precast Stairs from Ground to Second Floor
This project was a complex design period given the requirements and constraints. PSS collaborated closely with the design team to provide solutions and ultimately overcome the issues.
Work on this contract has shown our client the dedication to quality and has secured ongoing business with other projects.